-Installing clamps on piles
– Installation of metal chairs for pipes
-Sinking the pipes and tying them to the metal chairs
-Installing filters on pipe openings
-underwater pile cutting
Placement of 10 ton blocks for the walkway
-Installing the floating walkway over the pipes
_Installing a weed protection net